Sergey Zheleznyakov
Head of the corrosion diagnostics laboratory
Corrosion survey
We assess the coating of a newly built pipeline before handover, using the cathodic polarisation method. More than 280 km checked.
The method gives an overall assessment of coating quality on a section of pipeline that is already laid and backfilled. The work is done by the company's corrosion diagnostics laboratory.
Company photographs
On pipelines whose construction is complete, to assess the coating of a section as a whole.
Specialists of the company's own laboratory; four FROSIO level II coating inspectors are on staff.
Head of the corrosion diagnostics laboratory
Diameter, length, product, commissioning year and earlier survey documents help us answer to the point.