+375 (214) 75-18-18Send a request

Coating repair

Protective and decorative painting of steel structures

We prepare the surface and apply paint materials layer by layer, strictly to the approved painting scheme.

KM 01

Sequence of operations

  1. 01

    Surface preparation

    The surface is prepared for painting.

  2. 02

    Applying a layer

    Each layer is applied in sequence, in the order set by the painting scheme.

  3. 03

    Drying

    The next layer follows only after the previous one has dried.

KM 02

Who answers for quality

The laboratory has four FROSIO level II coating inspectors on staff. The company holds a certificate of conformity for anti-corrosion coating work.

Matching the colour to the chart
Matching the colour to the chart
KM 03

Photos from site

Painted pipework
Assembly after painting
Gas distribution station
Valve assembly
Above-ground section
Process pipework

Company photographs

KM 04

Questions and answers

What is a painting scheme?

It is the approved order of layers: which materials are applied and dried, and in what sequence.

Is the company approved for this work?

Yes. The certificate of conformity for anti-corrosion coatings is published in the Certificates section.

Describe your asset and we will scope the work

Diameter, length, product, commissioning year and earlier survey documents help us answer to the point.