+375 (214) 75-18-18Send a request

Projects

Our work

The pictures were taken by the company's specialists on site. Nothing staged or retouched.

KM 01

Named works

  • Vostochny gas distribution station
  • TETs-5 gas distribution station
  • Osipovichi branch line
  • Smolevichi gas distribution station
KM 02

Photos from site

Exposed pipeline section
Pipe after removal of the old coating
Failed coating before repair
A crew applying tape
Section after tape application
Coated bend in a wet trench
Hand application of tape on a joint
Coated tee
Work in the pit
Bedding and backfilling
The route after backfilling
Section under new coating
Coated ground-to-air transition
Applying the coating at a transition
Applying a polyurethane coating
Route with test posts
Test posts along the route
Coating condition in a control pit
Coating inspection in a pit
Control pit
Cathodic protection station
Cathodic protection cabinet
Pipeline route
Gas distribution station
Valve assembly
Painted pipework
Assembly after painting
Above-ground section
Process pipework
Matching the colour to the chart
Process site
Storage tank
Tank farm
Vertical steel tank

Company photographs

40+km

of protective coating repaired on pipes of various diameters

4,700+km

of trunk pipelines given a comprehensive corrosion survey

280+km

of newly built pipelines checked for coating quality

260+

underwater crossings given technical diagnostics

Figures as published by the company.

Describe your asset and we will scope the work

Diameter, length, product, commissioning year and earlier survey documents help us answer to the point.